Prosperous China Vigorous Tangxing

086-5542796608
Xiaoshan-Yiwu Pipeline Project
- 2021-08-10
Date: May 2021
Project Name: Shanghai-Kunming Expressway G60 Pipe Jacking Crossing Project of Xiaoshan-Yiwu Natural Gas Pipeline Project
Equipment: HRC2000
Soil Condition: 20m of (Strongly weathered) clay layer, 80m of moderately weathered rock, 80m of slightly weathered rock (mainly basalt, with granite crystal stones locally) and 2.5m of strongly weathered rock.
Jacking Distance and Jacking Section: 182.5 meters
Significance:
- This section is the first rock pipe jacking machine of our company in Yiwu.
- The customer used equipment from other companies before, and there was no external water supply, which caused the pipe to be locked. After purchasing our equipment, it went through smoothly.
- Two trainees from Tangxing Training School manage the project.
![]() |
![]() |
![]() |
![]() |
CONTACT US
EUROPE
Tangxing_Edward


+6010-397 6995

T1SERVICE@TANGXING.CN
MIDDLE EAST OR ASIA
Tangxing_Michael


+6010-293 6995

T2SERVICE@TANGXING.CN
AFRICA
Tangxing_Bonnie


+6010-825 6995

T3SERVICE@TANGXING.CN
AMERICAS
Tangxing_lvy


+8615305547358

IVY@TANGXING.CN

Sales hotline:86-0554-2796608
Copyright: Tangxing Machinery Record:皖ICP备16015277号-3