Prosperous China Vigorous Tangxing

086-5542796608
Xujiahe to Anlu Water Project
- 2021-08-31
Date: June 2020
Location: Suizhou City, Hubei Province
Equipment: 1500 rock micro tunnel boring machine
Feature: full-face hard rock, high rock strength, and traversing mountains
Significance:The "explosion method" was originally adopted for a section of the water delivery network of the project, but it was not applicable. In consequence, the trenchless pipe jacking method was used to excavate the mountain with a total length of 290 meters to lay water pipelines. Finally, the excavation broke through successfully.
![]() |
![]() |
![]() |
![]() |
CONTACT US
EUROPE
Tangxing_Edward


+6010-397 6995

T1SERVICE@TANGXING.CN
MIDDLE EAST OR ASIA
Tangxing_Michael


+6010-293 6995

T2SERVICE@TANGXING.CN
AFRICA
Tangxing_Bonnie


+6010-825 6995

T3SERVICE@TANGXING.CN
AMERICAS
Tangxing_lvy


+8615305547358

IVY@TANGXING.CN

Sales hotline:86-0554-2796608
Copyright: Tangxing Machinery Record:皖ICP备16015277号-3